GoodWe Guangde Park promotes PV generation systems, with Phase I (as of April 2023) featuring 2.8 MW of PV roofs on workshops, 25 kW of PV corridors, 319.1 kW of PV sheds, and 50 kW on the power distribution facility, totaling 3.2 MW. These systems generate 2.569 million kWh annually, increasing green power use to 10.1% in the Park. In 2023, the Park was recognized as a smart PV pilot enterprise by the Ministry of Industry and Information Technology. Future plans for Phase III include an additional 5.4 MW of PV roofs, aiming to raise green power use to 7.7%.