QCan Oasis operate off-grid?
Yes. Depending on the selected inverter, energy storage and system configuration, Oasis can support off-grid, hybrid and grid-connected applications.
Energy storage can be added according to project load and backup requirements.
-
QHow quickly can Oasis be deployed?
For Oasis Plus, 4–6 operators are required on site. Initial deployment can be completed in approximately 12 hours, and the PV array can be unfolded in around 10 minutes.
For Oasis Mini, 2 operators are required on site. After unboxing, they can use a cordless electric screwdriver to complete PV array unfolding or stowing in approximately 1 minute.
Actual deployment time may vary depending on site conditions and system configuration.
-
QWhat is the difference between Oasis Plus and Oasis Mini?
Oasis Plus is designed for project-scale applications such as construction sites, mines, islands and remote communities, with a rated PV capacity of 91.2 kWp.
Oasis Mini is a compact 5.7 kWp solution designed for smaller, distributed applications such as residential outdoor spaces, campsites, resorts and remote small-scale sites.